Bedroom

Bedroom

Sunday, December 29, 2013

NUMEROUS UPGRADES=MOVE-IN READY

Since we purchased our home in 2009, we have made the following upgrades:
  1. All interior walls painted in neutral tones
  2. Fan with light installed in living room and new light fixtures throughout
  3. Original wood floors in bedrooms (3) refinished (2009)
  4. Shower installed in upstairs bathroom (2009)
  5. New carpet in living room (2009)
  6. Basement cement floor painted with epoxy (2009)
  7. Basement bathroom remodeled: vinyl tile flooring installed; new vanity installed; new toilet installed.
  8. Upstairs hallway and bathroom tiled (2010)
  9. Privacy fence, wooden walkway and deck constructed (2010)
  10. Exterior painted (2011)
  11. Kitchen remodeled: peninsula added; new high-definition laminate countertops; new chandelier; new refrigerator, stove, and microwave; installed dishwasher; floors tiled; tile backsplash installed (2011-2012). 
  12. Cement stone walkways installed in front and in back of house (2012)
  13. New aluminum garage door (2013)
  14. New extra-wide gutters installed and fascia boards wrapped with aluminum (2013)
  15. Sewer pipe running to City Sewer replaced (approx. $5,000) (2013)
  16. Trees trimmed by Blue Ox tree service (2013)

No comments:

Post a Comment